AMC and New England F.L.O.W.

2009 Release Schedules for New England Rivers

 (updated:  7/2/09)

This information has been obtained directly from authorities controlling each release. It is updated on a regular basis to keep you informed of release cancellations or changes. Check back before traveling!

It must be understood that this information does not guarantee a specific flow in the river. River flow is subject to change without notice due to current availability of water, unanticipated weather and water conditions, equipment failure, as well as other unforeseeable causes. It is your responsibility to determine that the river flow is suitable for your intended use prior to putting on the river. It is your responsibility to monitor conditions while on the river for flow changes which might make the river unsuitable for your use.

Julia Khorana

(NE Army Corps Dam Release Coordinator)

 

Ashuelot River

Ayers Island – Pemi at Bristol.

Blackwater

Canada Falls

Dead River  **July 4th weekend release levels higher than scheduled**

Deerfield River – Fife Brook

Deerfield River – Monroe Bridge

Farmington – New Boston 

Kennebec

Magalloway River

Millers River

Lower Otter Brook

Quinnibaug River

Rapid River Seboomook

West River

Westfield - Knightville

 

 

Army Corps of Engineers, New England Division

Flood Control Dam Water Releases for 2009

(These have been confirmed, contingent on available water so check back before driving)

Lower Otter Brook:

Lower Otter Brook

Sat. March 28

Sun. March 29

9:00 am until water is depleted

300 cfs

Recreational 

 

Lower Otter Brook

Sat. April 25

Sun. April 26

9:00 am until

water is depleted

300 cfs

Recreational 

Lower Otter Brook

Sat. May 2

Sun. May 3*

9:00 am until water is depleted

300 cfs

ACA NH WW Championship *(if not enough water, priority day)

Millers River:

Birch Hill Dam

Tully Lake (300cfs)

Sat. April 11*

Sun. April 12

9 pm on Friday until water is depleted

1100 cfs

 

46th Annual River Rat Race (Saturday)

*(if not enough water, priority day)

Westfield River:

Knightville Dam

Littleville Dam

Fri. March 27

Sat.March 28

Sun.March 29

Fri. afternoon until water is depleted

 

drawdown of winter pool

Knightville Dam

(1000 cfs)

Littleville Dam

(300 cfs)

Sat. April 18*

Sun. April 19

6:00 am until water is depleted

1300 cfs

56th Annual Westfield River Races *(if not enough water, priority day)

 

Blackwater River:

Blackwater Dam

Sat. April 18

Sun. April 19

11:00am Sat until water is depleted

700cfs

 

Tentative release

Blackwater Dam

Fri. May 1

Sat. May 2

Sun. May 3

11:00am Fri until water is depleted

700cfs

 

Race cancelled.  ACOEs unable to provide water after May 1 because of farming

West River:

Ball Mountain

Townsend Dam

Mon, April 6 -

 Fri. April 10

8:30 am until water is depleted

 

Winter pool draw down for downstream migration of Atlantic Salmon smolt NOTE: this occurred on April 1

Ball Mountain

Townsend Dam

Fri, April 10 – Sun, April 12

Run of river

Predicted flows 850 cfs or less

Thursday am, 850 cfs. Cool wind is drying things up.

Ball Mountain

Townsend Dam

Sat, June 27-Sun, June 28

Ramping starts late Friday, flows until water depleted

1500 cfs

Repairs and rain have made it possible for this release.

Flows Sat and likely all day Sun (definitely morning).

 

Ball Mountain

Townsend Dam

Sat. April 25

Sun. April 26

 

 

Release unlikely because of water availability after draw down

Ball Mountain

Townsend Dam

Sat. May 16

Sun. May 17

 

 

Release unlikely because of water availability after draw down and maintenance of 25 ft pool for smolts

Ball Mountain

Townsend Dam

Sat. Sept. 26

Sun. Sept. 27* 

8:30 am until water is depleted

1500 cfs

 Recreational

* Sunday unlikely – depends on availability of water

Quinnibaug River:

Brimfield Lake

Sun. April 26

5 am until water is depleted

350 cfs

Sturbridge Lions Club East All American River Race

Ashuelot River:

Surrey Mountain Dam

Sat. May 2

5 am until water is depleted

275 cfs

Upper Ashuelot Canoe Race

 

 

2009 Deerfield River Releases

 

Fife Brook – Site code 255123 

Brookfield Power

106 scheduled releases. Releases from Fife Brook Dam start between 9:30 am and 12 noon, with a flow of at least 700 cfs, for a 3-hour duration.

April

4-5, 15-19, 22-26, 29-30

 

May

1-3, 9-10, 16-17, 20-24, 27-31

 

June

13-14, 17-21, 24-28

 

July

3*, 4-5, 11-12, 15-19, 22-26, 29-31

 

August

1-2, 5*, 6-9, 12*, 13-16, 19*, 20-23, 27-30

 

September

2-6, 9-13, 17-19, 27 30

 

October

1-4, 7-11

 

(* July 3 starts 1:00 pm, August 5, 12, 19 start at 2 pm)

 

Monroe Bridge (#5 Bypass) – Site code 255122

TransCanada Hydro Northeast, Inc

32 scheduled releases. Friday releases are for 4 hours beginning at 11 a.m. Saturday releases last 5 hours and begin at 10 a.m. Sunday releases are 4 hours beginning at 10 a.m. Flows alternate among 900, 1000, and 1100 cfs (see flow schedule below site codes).

 

May

23, 24

 

June

14, 19(Fri), 20, 21, 26(Fri), 27, 28

 

July

3(Fri), 4, 5, 11, 12, 24(Fri), 25, 26

 

August

1, 2, 8, 14(Fri), 15, 23, 28(Fri), 29, 30

 

September

5, 6, 12, 13

 

October

10, 11

 

 

Scheduled Monroe Bridge Flows

(please note: flows are subject to changing conditions!)

May 23

1100 cfs

July 5

1000 cfs

August 23

900 cfs

May 24

900

July 11

1100

August 28(Fri)

1000

June 14

1000

July12

900

August 29

1100

June 19(Fri)

1100

July 24 (Fri)

1000

August 30     

900

June 20

900

July 25

1100

September 5

1000

June 21

1000

July 26

900

September 6

1100

June 26(Fri)

1100

August 1

1000

September 12

900

June 27

900

August 2

1100

September 13        

1000

June 28

1000

August 8

900

October 10

1100

July 3 (Fri)

1100

August 14(Fri)

1000

October 11   

900

July 4

900

August 15

1100

        

 

 

Special events:

 

Deerfield River Cleanup:

National River Cleanup Week - TBA

Massachusetts Free Fishing Weekend:

June 6 & 7 (minimum flow weekend)

Zoar Gap White Water Plunge:

Saturday, June 13

Charlemont Down River Race:

Saturday, June 27

Deerfield Riverfest and Race:

July 24, 25, 26

 

Call before you drive!

For flow information call WaterlineÕs free national telephone hotlines:

1-800-452-1742 for the AnglerÕs Edition; 1-800-452-1737 for the BoaterÕs Edition.

At the prompt, dial-in a six digit site code for the specific river each of interest.

#5 Bypass (Monroe Bridge, a.k.a. Dryway):    Site code 255122

Fife Brook:    Site code 255123

Also available at    

http://www.h2oline.com/TRC.asp

http://www.h2oline.com/REL.asp

 

Deerfield River Site Codes

505124

Deerfield River at Somerset Dam, Somerset, VT

505125

Deerfield River  at Searsburg Development, Searsburg, VT

505126

Deerfield River at Harriman Development, Readsboro, VT

255121

Deerfield River at Sherman Dam, Rowe, MA

255122

Deerfield River at No. 5 Development, Monroe Bridge, MA

255123

Deerfield River at Fife Brook Dam, Florida, MA

255124

Deerfield River at No. 4 Development, Shelbourne Falls, MA

255125

Deerfield River at No. 3 Development, Shelbourne Falls, MA

255126

Deerfield River at No. 2 Development, Buckland, MA

 

 

 

2009 Dead River Whitewater Releases 

Kennebec Water Power Company

Day

Date

Release

 

Saturday

2 May

7000+ cfs

 

Saturday

9 May

7000+ cfs

 

Sunday

24 May

5500+ cfs

 

Saturday

30 May

5500+ cfs  *

 

Saturday

6 June

5500+ cfs  *

 

Saturday

13 June

3500 cfs    *

 

Saturday

27 June

1800 cfs    *

 

Wednesday

1 July

1300 cfs **

 

Thursday

2 July

1300 cfs **. 

 

Friday

3 July

1300 cfs **

 

Saturday

4 July

1300 cfs ** 

 

Sunday

5 July

1300 cfs **

 

Saturday

25 July

2400 cfs    *

 

Sunday

26 July

1800 cfs    *

 

Saturday

8 August

2400 cfs    *

 

Sunday

9 August

3500 cfs    *

 

Sunday

6 September

5500 cfs    *

 

Saturday

19 September

3500 cfs *

 

Saturday

3 October